“A Rather Be Fishing Company” — Serving Genesee, Oakland & Southeast Michigan CareersSubcontractors 810-938-8498

Construction Guides & Resources

Straight answers to common questions about remodeling, building and site work in Southeast Michigan.

Guides

Plan Your Project

Design-Build vs. Design-Bid-Build: Which Is Right for Your Project?

Design-build puts design and construction under one contract for speed and a single point of responsibility; design-bid-build separates them for maximum design control and competitive pricing.

Read the guide

Planning a Kitchen or Bathroom Remodel in Southeast Michigan

Define scope first, set a budget with a contingency, make selections before demolition, confirm permits, and hire a contractor who manages trades and inspections.

Read the guide

What Site Work Does a Commercial Building Need?

Commercial site work includes clearing and demolition, earthwork and grading, underground utilities, storm water management, paving, concrete and final grading — often a large share of total project cost.

Read the guide

Do You Need a Permit for a Pole Barn in Michigan?

Most pole barns and garages over 200 square feet need a building permit. Farm buildings used for agriculture can be exempt from the building permit, but zoning rules still apply.

Read the guide

Permits and Approvals for Commercial Construction in Genesee County, Michigan

A new commercial building typically needs local site plan approval, a soil erosion permit, driveway and utility permits, and building and trade permits before it can open.

Read the guide

Building a Custom Home in Michigan: Steps From Lot to Move-In

Check the lot first, then design and price the home, get permits, complete site work and the foundation, build and inspect the home, and finish with a certificate of occupancy.

Read the guide

We’d rather be fishing.

That’s why we build it right the first time. Tell us about your project and get a straight answer on scope, schedule and budget.